ACE Packages can be fitted to any sized wastewater screening plant from any manufacturer
The modular flexible design of the key components, including the Lisep, allows for the plant footprint to be minimised. Please feel free to contact us for a FREE SITE SURVEY or for assistance from our design engineers for your project.
This high performance dewatering system reduces the output from screens by up to 95% so only 5% ends up in the skip with smelly organic material returned to the flow where it will bring benefits to upstream processes. This compares favourably with systems where as much as 20% of the output is dumped into the skip.
- Minimises foul odours on site
- Reduces lorry movements to landfill by a factor of 4 over competitor products
- Reduces methane production at landfill
- Reduces CO2 production.
- Better sludges
- Prevention the starvation of biological filters
- Better whole life cost
All supported by our team in the UK and 24hr strategic spares supply and service exchange policy for both our Framework and Non-Framework partners
Examples from the hundreds of installations in the UK and abroad | Specification
2 x Conditioning tanks with 2 Series 400 Macipump 400's and 1 No 302 grit pump.
The main section of the tank into which the screenings are fed and processed is fitted with grit flushing pipework, covers and an odour extract point.
2 x Handle operated Conditioning tank toe isolation blade to allow a Macipump to be removed for maintenance while keeping the plant running.
4 x Duty / Duty/ Standby / Standby Series 400 Macipump 400's. Each capable of pumping 24 l/s of diluted conditioned screenings to the LS403 grit settlement tank.
2 x Duty /duty Haigh Series 302 vertically mounted grit pump to pump grit/stones containing some sewage screenings at a rate of up to 13L/S at upto 7 M total head.
|